The Green Gorilla Project has contracted CTR Contractors Ltd to prep their front concrete slab. Sami the Site Supervisor is using a 1 tonne Digger and a Plate Compactor to excavate and prepare the area for the concrete placement.
Sami has excavated the existing rock sediments and prepped it for the Hard-filling Gap-7 phase.
Sami is checking every angle of the area to see if everything is accurately balanced and stable before compacting for a strong foundation area.
Double-checking the heights and the area before using the Plate Compactor to compact the area that has been covered with Gap-7.
Finishing look at the deck area after the Compaction phase.