Green Gorilla Project

civil engineers consultants

civil engineers consultants

The Green Gorilla Project has contracted CTR Contractors Ltd to prep their front concrete slab. Sami the Site Supervisor is using a 1 tonne Digger and a Plate Compactor to excavate and prepare the area for the concrete placement.

civil design consultants

Sami has excavated the existing rock sediments and prepped it for the Hard-filling Gap-7 phase.

civil environmental consultants

Sami is checking every angle of the area to see if everything is accurately balanced and stable before compacting for a strong foundation area.

civil environmental consultants

Double-checking the heights and the area before using the Plate Compactor to compact the area that has been covered with Gap-7.

civil consulting engineers

Finishing look at the deck area after the Compaction phase.